💥 Gate Square Event: #PostToWinCGN 💥
Post original content on Gate Square related to CGN, Launchpool, or CandyDrop, and get a chance to share 1,333 CGN rewards!
📅 Event Period: Oct 24, 2025, 10:00 – Nov 4, 2025, 16:00 UTC
📌 Related Campaigns:
Launchpool 👉 https://www.gate.com/announcements/article/47771
CandyDrop 👉 https://www.gate.com/announcements/article/47763
📌 How to Participate:
1️⃣ Post original content related to CGN or one of the above campaigns (Launchpool / CandyDrop).
2️⃣ Content must be at least 80 words.
3️⃣ Add the hashtag #PostToWinCGN
4️⃣ Include a screenshot s
EOS Network Foundation: The Spring 1.0 hard fork is expected to take place on September 25th.
PANews July 10th news, EOS Network Foundation stated in their official blog that Spring 1.0 and Savanna Consensus Algorithm will be the most important upgrades for EOS since the network was launched. To ensure a smooth rollout and safe transition, the EOS Network Foundation is updating release dates and community testing guidelines. The stable version is scheduled to be released on September 4, 2024, and the Hard Fork or Consensus upgrade is planned for September 25, 2024. All Node operators must be prepared for the upcoming Hard Fork to continue participating in the EOS network. After the Hard Fork is activated, the final confirmation time for EOS will be greatly reduced from several minutes to several seconds.