Futures
Access hundreds of perpetual contracts
TradFi
Gold
One platform for global traditional assets
Options
Hot
Trade European-style vanilla options
Unified Account
Maximize your capital efficiency
Demo Trading
Introduction to Futures Trading
Learn the basics of futures trading
Futures Events
Join events to earn rewards
Demo Trading
Use virtual funds to practice risk-free trading
Launch
CandyDrop
Collect candies to earn airdrops
Launchpool
Quick staking, earn potential new tokens
HODLer Airdrop
Hold GT and get massive airdrops for free
Launchpad
Be early to the next big token project
Alpha Points
Trade on-chain assets and earn airdrops
Futures Points
Earn futures points and claim airdrop rewards
The entire contact wire power supply for the Shaanxi section of the West Ten High-Speed Railway has been successfully completed.
People’s Financial News, March 27 - At 10:36 PM on March 26, the entire contact network of the Xi’an to Shiyan high-speed railway section in Shaanxi successfully completed power supply, laying the groundwork for the subsequent joint debugging and testing. The contact network, as the core part of the high-speed rail power supply system, successfully supplying power is a significant test for the electrified railway contact network. It is also the last important procedure before joint debugging and testing, and a prerequisite for the normal operation of the high-speed rail. After the Xi’an to Shiyan high-speed railway opens, travel from Xi’an to Shiyan will take about 1 hour, Xi’an to Xiangyang is expected to take 2 hours, and Xi’an to Wuhan can be reached in 3 hours. (CCTV News)